1. Home
  2. Equipment
Equipment

A full control tower that travels by road.

An elevated cab with a 360° view, redundant radios, and self-contained power, built to set up on almost any airfield, field, or staging area.

ATC TOWER PROS
01 Glassed cab
02 Antennas & beacon
03 Mast
04 Trailer & outriggers

Mobile Tower Spec Sheet

[Model name]
Setup timeArrival to operational
[X] hours
Cab heightController eye level
[X] ft
Cab interiorDimensions
[L × W × H]
PositionsController workstations
[X] positions
PowerPrimary / backup
[Generator spec]
TransportTowing & footprint
[Trailer size / tow req.]
CommsRadios & frequencies
[VHF/UHF config]
Operating conditionsWind / temperature limits
[Operating limits]
Systems

Equipment details

Final specifications will be confirmed by the ATC Tower Pros team.

Comms Equipment

  • Air-band radios[Make / model]
  • Backup radios[Quantity / type]
  • Ground-to-ground radios[Quantity / type]
  • Antenna mast[Height]
  • Frequency recording[Recorder spec]

Power

  • Primary power[Generator spec]
  • Backup power[Backup / UPS spec]
  • Fuel capacity / runtime[X] hours
  • Shore power option[Yes / No, spec]

Transport & Footprint

  • Trailer dimensions (travel)[L × W × H]
  • Footprint (deployed)[L × W]
  • Tow vehicle requirement[Tow req.]
  • Surface requirements[Surface / slope limits]

Cab & Visibility

  • Visibility360° glassed cab
  • Glazing[Glass type / tint]
  • Climate control[HVAC spec]
  • Light gun[Yes / No]
Setup Timeline

From arrival to operational

Typical sequence. Durations are placeholders until the client confirms them.

[T – X days]

Site survey & planning

We confirm placement, sightlines, access, and the coordination timeline.

[T – X hours]

Delivery

The tower is towed to site and positioned at the agreed location.

[X min]

Leveling & mast raise

Outriggers are deployed, the trailer is leveled, and the cab is raised.

[X min]

Power & comms

Power is brought online and radios and antennas are installed and tested.

[X min]

Radio checks & briefing

We run frequency checks and brief controllers with your ops team.

Go

Tower operational

Controllers take position and the tower opens for traffic.

Need a specific configuration?

Tell us about your site and traffic and we will recommend the right setup.